Welcome to The Education Overview

Education News

Cabinet approves construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.4 km with an outlay of Rs. 4447.38 Crore

Cabinet approves construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.4 km with an outlay of Rs. 4447.38 Crore

Posted On: 10 SEP 2025 3:02PM by PIB Delhi

The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today has approved the Construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.400 km and Total Capital Cost of Rs. 4447.38 crore.

The section passes through or provides connectivity to important regional cities such as Mokama, Barahiya, Lakhisarai, Jamalpur, Munger connecting to Bhagalpur, as indicated in the map at Annexure-I.

The Munger–Jamalpur-Bhagalpur belt in Eastern Bihar is emerging as a key industrial region focusing on ordinance factory (Existing gun factory and 1 more proposed as part of Ordnance Factory Corridor by M/o Defence), locomotive workshop (in Jamalpur), food processing (e.g., ITC in Munger) and related logistics & warehousing hubs. Bhagalpur stands out as a textile and logistics hub, led by Bhagalpuri silk (details of proposed textile ecosystem in Bhagalpur. Barahiya is emerging as a region for food packaging, processing and agro-warehousing. The increased economic activity in the region is expected to drive up the freight movement and the traffic on the Mokama-Munger section in the future.

The 4-lane access-controlled corridor with close tolling, supporting average vehicular speeds of 80 km/h with design speed of 100 km/h will reduce the overall travel time to approximately 1.5 hours, while offering safer, faster, and uninterrupted connectivity for both passenger and freight vehicles.

The proposed project with 82.40 km will generate about 14.83 lakh man-days of direct employment and 18.46 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor.

Annexure-1

Project Alignment Map for Mokama-Munger

Click Here to Share the News

The Education Overview

The Education Overview is an Education Web Portal, which is an information, knowledge and education news hub for Schools, Colleges, Higher Education Institutions and Universities etc. This Web Portal will deliver upcoming events, workshops, conferences, seminars, success events, achievements and accomplishment stories of educators, educational leaders and educational institutions. www.theeducationoverview.in Schools, Colleges, Universities and all other educational institutions are requested to send News / Press Releases, Good quality photographs, Upcoming events, Workshops, Conferences, Seminars, Campus happenings, Books and reviews, Call for papers, Call for chapters, Scholarships, Appointment news, Success events, Achievements and accomplishment stories of educators and educational leaders... Please mention in Subject : The Education Overview Chief Editor : Dr. Umrao Jamir Sayyad, MBA; PGDBM; M.Phil; PhD (Business Administration) Email :- shaikhumrao@gmail.com Mobile Number/ WhatsApp :- 9850820398

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Translate »
Don`t copy text!