{"id":6733,"date":"2025-09-24T17:38:02","date_gmt":"2025-09-24T12:08:02","guid":{"rendered":"https:\/\/theeducationoverview.in\/?p=6733"},"modified":"2025-09-24T17:38:02","modified_gmt":"2025-09-24T12:08:02","slug":"cabinet-approves-construction-of-4-lane-greenfield-access-controlled-mokama-munger-section-of-the-buxar-bhagalpur-high-speed-corridor-in-bihar-on-hybrid-annuity-mode-ham-with-a-total-project-length","status":"publish","type":"post","link":"https:\/\/theeducationoverview.in\/?p=6733","title":{"rendered":"Cabinet approves construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.4 km with an outlay of Rs. 4447.38 Crore"},"content":{"rendered":"<div class=\"text-center event-heading-background\">\n<h2 id=\"Titleh2\" style=\"text-align: justify;\"><span style=\"color: #3366ff;\"><strong>Cabinet approves construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.4 km with an outlay of Rs. 4447.38 Crore<\/strong><\/span><\/h2>\n<h2 style=\"text-align: justify;\"><strong style=\"color: #3366ff; font-size: 16px;\">Posted On: 10 SEP 2025 3:02PM by PIB Delhi<\/strong><\/h2>\n<\/div>\n<div class=\"pt20\" style=\"text-align: justify;\"><\/div>\n<p style=\"text-align: justify;\"><span style=\"color: #3366ff;\"><strong>The Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi today has approved the Construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.400 km and Total Capital Cost of Rs. 4447.38 crore.<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #3366ff;\"><strong>The section passes through or provides connectivity to important regional cities such as Mokama, Barahiya, Lakhisarai, Jamalpur, Munger connecting to Bhagalpur, as indicated in the map at Annexure-I.<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #3366ff;\"><strong>The Munger\u2013Jamalpur-Bhagalpur belt in Eastern Bihar is emerging as a key industrial region focusing on ordinance factory (Existing gun factory and 1 more proposed as part of Ordnance Factory Corridor by M\/o Defence), locomotive workshop (in Jamalpur), food processing (e.g., ITC in Munger) and related logistics &amp; warehousing hubs. Bhagalpur stands out as a textile and logistics hub, led by Bhagalpuri silk (details of proposed textile ecosystem in Bhagalpur. Barahiya is emerging as a region for food packaging, processing and agro-warehousing. The increased economic activity in the region is expected to drive up the freight movement and the traffic on the Mokama-Munger section in the future.<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #3366ff;\"><strong>The 4-lane access-controlled corridor with close tolling, supporting average vehicular speeds of 80 km\/h with design speed of 100 km\/h will reduce the overall travel time to approximately 1.5 hours, while offering safer, faster, and uninterrupted connectivity for both passenger and freight vehicles.<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #3366ff;\"><strong>The proposed project with 82.40 km will generate about 14.83 lakh man-days of direct employment and 18.46 lakh man-days of indirect employment. The project will also induce additional employment opportunities due to increase in economic activity in the vicinity of the proposed corridor.<\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #3366ff;\"><strong><u>Annexure-1<\/u><\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #3366ff;\"><strong><em>Project Alignment Map for Mokama-Munger<\/em><\/strong><\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #3366ff;\"><strong><em><img decoding=\"async\" src=\"https:\/\/static.pib.gov.in\/WriteReadData\/userfiles\/image\/CCEApic10092025X82K.jpg\" alt=\"\" \/><\/em><\/strong><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cabinet approves construction of 4-lane greenfield access-controlled Mokama-Munger section of the Buxar-Bhagalpur High-Speed Corridor in Bihar on Hybrid Annuity Mode (HAM) with a total project length of 82.4 km with an outlay of Rs. 4447.38 Crore Posted On: 10 SEP 2025 3:02PM by PIB Delhi The Cabinet Committee on Economic Affairs chaired by the Prime &hellip;<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-6733","post","type-post","status-publish","format-standard","hentry","category-education-news"],"_links":{"self":[{"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=\/wp\/v2\/posts\/6733","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=6733"}],"version-history":[{"count":1,"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=\/wp\/v2\/posts\/6733\/revisions"}],"predecessor-version":[{"id":6735,"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=\/wp\/v2\/posts\/6733\/revisions\/6735"}],"wp:attachment":[{"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=6733"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=6733"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/theeducationoverview.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=6733"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}